David's RV-10 Build

Just another RV-10 builders log

Day: March 25, 2014

Tailcone work

Today I finished drilling the left side longeron. After that I finished match drilling all the holes in the skin. This wasn’t as bad as it has been in the past as I already had drilled most of the holes in previous steps. After that I installed the remaining bulkhead & stiffeners and installed the top skins.

David's RV-10 Build © 2015