David's RV-10 Build

Just another RV-10 builders log

Tailcone work

Today I finished drilling the left side longeron. After that I finished match drilling all the holes in the skin. This wasn’t as bad as it has been in the past as I already had drilled most of the holes in previous steps. After that I installed the remaining bulkhead & stiffeners and installed the top skins.

Updated: March 26, 2014 — 7:58 pm

Leave a Reply

Your email address will not be published. Required fields are marked *

David's RV-10 Build © 2015