David's RV-10 Build

Just another RV-10 builders log

Day: October 2, 2014

Right Top wing skin

Today Corey & I really did got at the right wing. I’d say we did probably about 3/4 to 7/8s of all the rivets to be done. I also put some conduit in the ribs. I don’t think I posted before, but I am using the 5/8″ black conduit from Van’s. I ordered 50′ of it and I have ALOT left over. After Corey left, I reorganized my toolbox a bit and really cleaned it out. This was well needed to be done. I also ended up making a wood block to hold my countersinks. I am not sure why I didn’t do this before.

David's RV-10 Build © 2015