Today Corey & I really did got at the right wing. I’d say we did probably about 3/4 to 7/8s of all the rivets to be done. I also put some conduit in the ribs. I don’t think I posted before, but I am using the 5/8″ black conduit from Van’s. I ordered 50′ of it and I have ALOT left over. After Corey left, I reorganized my toolbox a bit and really cleaned it out. This was well needed to be done. I also ended up making a wood block to hold my countersinks. I am not sure why I didn’t do this before.
Categories
- 06) Vertical Stabilizer
- 07) Rudder
- 08) Horizontal Stabilizer
- 09) Elevators
- 10) Tailcone
- 11) Empennage Attach
- 12) Empennage Fairings
- 13) Main Spars
- 14) Wing Ribs
- 15) Rear Spar
- 16) Top Wing Skins
- 17) Leading Edge
- 18) Fuel Tanks
- 19) Stall Warning System
- 20) Bottom Wing Skins
- 21) Ailerons
- 24) Wing Tips
- Empennage
- Fuselage
- Misc.
- Service Bullitens
- Tools
- Wings
- Workshop
Websites of Interest
Other RV-10 Builders
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 | 31 |