{"id":262,"date":"2014-05-16T21:41:04","date_gmt":"2014-05-17T01:41:04","guid":{"rendered":"http:\/\/rv10.daviid.net\/?p=262"},"modified":"2014-05-18T22:04:13","modified_gmt":"2014-05-19T02:04:13","slug":"putting-things-together","status":"publish","type":"post","link":"http:\/\/rv10.daviid.net\/?p=262","title":{"rendered":"Putting things together!"},"content":{"rendered":"<p>Poor logging this week, but Ill get over it. Last week I ordered a bunch of spare rivets, some NACA ducts, flanges and hoses for the cabin air that will be installed later. Turns out I ordered the wrong flanges but its not the end of the world. First thing I did was install the ball joints into the elevators. The plans call for a 7\/8&#8243; gap from the center of the hole to the front spar of the elevator. This was pretty easy.<\/p>\n<p><a href=\"http:\/\/rv10.daviid.net\/gallery\/i.php?\/upload\/2014\/05\/18\/20140518184251-536603fd-me.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"http:\/\/rv10.daviid.net\/gallery\/i.php?\/upload\/2014\/05\/18\/20140518184251-536603fd-me.jpg\" alt=\"\" width=\"335\" height=\"594\" \/><\/a><\/p>\n<p>next I mounted the horizontal stabilizer to one of the many workbenches I had with 4 Sheetrock screws. Next I mounted one of the elevators to the horizontal stabilizer and made sure I had the clearances needed. then I had to file down a bushing so it would fit in the bearing to drill the final pivot point. after a quick trip to a local tooling shop, I was able to drill the hole in the control horns. Rinse wash repeat for the other side.<\/p>\n<p>after mounting both elevators back on I marked and drilled the control horns for the push rod. the plans next call for the elevators to be removed. but I was in no mood to do that considering how much of a PITA it was to get the nuts tightened on there.<\/p>\n<p>I believe next I match drilled the Vertical Stabilizer attach bracket and made the spacers for the horizontal stabilizer.<\/p>\n<div style=\"width: 802px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/rv10.daviid.net\/gallery\/i.php?\/upload\/2014\/05\/18\/20140518184254-74c8c727-me.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/rv10.daviid.net\/gallery\/i.php?\/upload\/2014\/05\/18\/20140518184254-74c8c727-me.jpg\" alt=\"\" width=\"792\" height=\"447\" \/><\/a><p class=\"wp-caption-text\">spacers made from the plans (photocopied 4 times) for templates<\/p><\/div>\n<div style=\"width: 345px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/rv10.daviid.net\/gallery\/i.php?\/upload\/2014\/05\/18\/20140518184258-49f48c62-me.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/rv10.daviid.net\/gallery\/i.php?\/upload\/2014\/05\/18\/20140518184258-49f48c62-me.jpg\" alt=\"\" width=\"335\" height=\"594\" \/><\/a><p class=\"wp-caption-text\">parts primed<\/p><\/div>\n<p>Once these parts dried, I taped the spacers onto the bottom of the HS attach brackets. Next i mounted the HS Assembly onto the tailcone. I finished the day off by match drilling the 4 attach points towards the rear. I installed the nuts &amp; bolts as called out in the plans as I drilled each hole.<\/p>\n<p><a href=\"http:\/\/rv10.daviid.net\/gallery\/_data\/i\/upload\/2014\/05\/18\/20140518184302-55b45898-me.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"http:\/\/rv10.daviid.net\/gallery\/_data\/i\/upload\/2014\/05\/18\/20140518184302-55b45898-me.jpg\" alt=\"\" width=\"792\" height=\"447\" \/><\/a><\/p>\n<p><a href=\"http:\/\/rv10.daviid.net\/gallery\/_data\/i\/upload\/2014\/05\/18\/20140518184305-02935dfc-me.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"http:\/\/rv10.daviid.net\/gallery\/_data\/i\/upload\/2014\/05\/18\/20140518184305-02935dfc-me.jpg\" alt=\"\" width=\"792\" height=\"447\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Poor logging this week, but Ill get over it. Last week I ordered a bunch of spare rivets, some NACA ducts, flanges and hoses for the cabin air that will be installed later. Turns out I ordered the wrong flanges but its not the end of the world. First thing I did was install the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[14],"tags":[],"class_list":["post-262","post","type-post","status-publish","format-standard","hentry","category-11-empennage-attach"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p4NjaO-4e","_links":{"self":[{"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=\/wp\/v2\/posts\/262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=262"}],"version-history":[{"count":1,"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=\/wp\/v2\/posts\/262\/revisions"}],"predecessor-version":[{"id":263,"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=\/wp\/v2\/posts\/262\/revisions\/263"}],"wp:attachment":[{"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=262"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/rv10.daviid.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}